Reform Project Of Facade
Architect: RAFAEL MANENE
Location: Street Areatza 37, Plencia Vizcaya, Basque Country, Spain.
Year: 2012
Applicator: AISLATEC
Investor: Family Barrenetxea
Category: Renovation
The family Barrenetxea we responsible reform of the facade of the family home of his property.

The requirements of the property is to improve the current status of the facade and retrieve the image at the beginning of the building after 2 loss in the reforms that are not cared nor respect the architecture and the original design of the building.

In a first moment we plan to carry out a rehabilitation with conventional materials, paint and overturned mortar mainly, but we see that with this type of reform we couldn't solve the three pathologies observed in the building with what the reform would be only in a aesthetic solution.

Condensation.

Humidities by filtration on the facade.
Embrittlement of the revoked mortar for various reasons.

We find that the design requires that we have proposed new moldings similar to the original and new modulation of the facade of the mortar with scratched each 80 cm which in principle seems complicated system resolve with the Sate.

With the advice of Baumit we see that it is possible to achieve the above-mentioned moldings in a material compatible with the Sate and also to do with the scratched horizontal guarantees of the facade.

With all this added information in the new project, and with the new budget we developed the proposal of the change of the constructive system property that accepts despite the increase in the total price of the offer.

The reform is carried out between January and April of 2013 and despite face with heavy rains during the execution of the work the work of the installation company of the Sate and the impeccable construction company are providing the labor with a minimum period of delay for 1 week.

This has been our first experience in the implementation of a system Sate and has been entirely satisfactory because in addition to the recovery aesthetics of the building in which we have been very demanding, in 1 month, all the problems of dampness and condensation were resolved to the surprise and joy of the owners.
Baumit materials:
-Baumit STARSYSTEM EPS 6 CMS
-Baumit CERAMICSYSTEM EPS 6 CMS
-BAUMIT FACHADE PROFILES