DOWNLOAD ALL
BACK TO JURY MEMBERS
CLOSE PROJECT
JURY MEMBER
Close
E-Mail:
loading
Close
Close
EDIT SUCCESFUL!
THANK YOU FOR YOUR COOPERATION!
Close
1+2 family residential dwelling
More family residential dwelling
Non-residential building
Thermal renovation
Renovation
No projects found.
Kaufbeuren, House of Energy
Architect: Barbara Glantschnig, Kaufbeuren
Location: Kaufbeuren, Germany
Year: 2012
Applicator: Lambda Fassaden, Kaufbeuren
Investor: Bauherr Markus Meyer, Kaufbeuren
Category: Non-residential building

The House of Energy, a multifunctional office building with an apartment for the operations manager/company director at the Passive House Plus Standard.

As well as the building principals Markus Mayer and his company AIROPTIMA, the building is the new headquarters for companies from the fields of architecture, housing technology and social media.

A building with pioneering technology combined with a perfectly insulated building shell.

A ground-coupled heat pump supplies the building with any residual heating required and also with warm water.

It draws its energy from deep probes inside the plot of land.

In order to generate the renewable energy for the ground-coupled heat pumps, ventilation equipment and the general electricity supply, extensive photovoltaic systems have been installed on the roof of the building and the garage.

Initial calculations indicate that these produce ca. 52,000 kWh/a.

This renewable source of electricity, which is used predominantly to power the building in accordance with the Renewable Energy Sources Act, is guaranteed produce more than the entire energy consumption of the building and its operations - a balanced “plus” building!

And last but not least, the shell of the building must fulfil its requirements.

The building principal decided on the ETICS Star System well in advance.

This meant that detailed solutions appropriate to building sites could be agreed and clarified in advance.

The deployment of pre-fabricated shutter boxes and EPS corner elements are examples of this.

In particular, the material of the ETICS construction was colour-coordinated to the façade.

Baumit materials:
StyleTop
ArtLine Puracryl
ArtLine Silicon
ProContact DC 56
SilverFlex
ProTherm 035 W, 240 mm
IMAGES
01 / 13
Inline popup